Zobrazení ceny: bez DPH
Zobrazovaná měna:
Řadit dle:

Upřesnit výběr pro "UIC - Všechny - strana 181" dle:    


UIC D101/RP20-1ed.

Circulation of thermal reactions on bridges with continuously welded track (theoretical studies and applications)

Vybrané provedení:

Zobrazit všechny technické informace
8 803.40


do 7 pracovních dnů
UIC D101/RP21-1ed.

Measurement of thermal effects on track and structure in the case of a DB steel boxgirder bridge with continuous ballast bed (IsarBrücke MunichNorth) (Additions and conclu sions)

Vybrané provedení:

Zobrazit všechny technické informace
8 803.40


do 7 pracovních dnů
UIC D101/RP22-1ed.

Measurement of the thermal effects in the interaction between continuous welded rails and superstructure in the case of a SNCF bridge with steel side bearers with concrete slab and ballast (Donzere bridge on the Paris Marseille line)

Vybrané provedení:

Zobrazit všechny technické informace
8 803.40


do 7 pracovních dnů
UIC D101/RP23-1ed.

Measurement of the thermal effects in the interaction between continuous welded rails and superstructure in the case of a CSD steel bridge with track laid direct (Chlumpcany bridge)

Vybrané provedení:

Zobrazit všechny technické informace
8 803.40


do 7 pracovních dnů
UIC D101/RP24-1ed.

Thermal phenomena in the interaction between CWR and bridges in the case of a RENFE prestressed concrete bridge with 20 isostatic spans carrying ballasted track (HACHO bridge)

Vybrané provedení:

Zobrazit všechny technické informace
8 803.40


do 7 pracovních dnů
UIC D101/RP25-1ed.

Thermal phenomena in the interaction between CWR and bridges in the case of a DB prestressed concrete bridge with ballasted track (Kocher Bridge at Kochendorf)

Vybrané provedení:

Zobrazit všechny technické informace
5 878.20


do 7 pracovních dnů
UIC D101/RP26-1ed.

Thermal phenomena in the interaction between CWR and bridges in the case of a steel CFF bridge with three spans, an expansion lenght of 56 m, non ballasted track and CWR (bridge across the Emmen near Luterbach)

Vybrané provedení:

Zobrazit všechny technické informace
5 878.20


do 7 pracovních dnů
UIC D101/RP27-1ed.

Measurement of the thermal effects in the interaction between continuous welded rails and superstructure in the case of a CFF twospan steel structure with an expansion lenght of 110 m, nonballasted track and long welded rails (bridges across the Aare near

Vybrané provedení:

Zobrazit všechny technické informace
5 878.20


do 7 pracovních dnů
UIC D101/RP28-1ed.

Interactions between track and structure due to the influence of temperature in the case of continuous welded rails: synthesis report

Vybrané provedení:

Zobrazit všechny technické informace
8 803.40


do 7 pracovních dnů
5 878.20


do 7 pracovních dnů

Zobrazen záznam od 1800 až 1810 z celkem 2614 záznamů.


Potřebujete pomoci?


Cookies Cookies

Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů.