Publikace  VDA Volume 6 Part 3 (Wire-O-binding) Process Audit. Potential Analysis, Product and Production Process Development, Product and Production Process Implementation, Series Production. 4th revised edition, January 2023 1.1.2023 náhled

VDA Volume 6 Part 3 (Wire-O-binding) Process Audit. Potential Analysis, Product and Production Process Development, Product and Production Process Implementation, Series Production. 4th revised edition, January 2023

VDA Volume 6 Part 3 (Wire-O-binding) Process Audit. Potential Analysis, Product and Production Process Development, Product and Production Process Implementation, Series Production. 4th revised edition, January 2023

Přeložit název

PUBLIKACE vydána dne 1.1.2023


Jazyk
Provedení
Dostupnostdo 7 pracovních dnů *)
Cena1 972.60 bez DPH
1 972.60

Informace o produktu:

Označení: VDA Volume 6 Part 3 (Wire-O-binding) Process Audit. Potential Analysis, Product and Production Process Development, Product and Production Process Implementation, Series Production. 4th revised edition, January 2023
Přibližná hmotnost: 300 g (0.66 liber)
Datum vydání: 1.1.2023
Země: Německá publikace
Kategorie: Německé publikace
*) U zboží, které není skladem a musí se objednávat u vydavatele, budou započítány i skutečné náklady na dopravné a balné. Jejich výši Vám sdělíme na základě Vašeho dotazu na e-mailu info@normservis.cz, popř. na telefonním čísle +420 566 621 759.

Anotace textu normy :


VDA 6.3 was published for the first time in 1998 and was revised in 2010, 2016 as well as 2023 (present edition).
What has changed compared to the 2016 version?
- Software aspects have been taken into consideration in the questionnaire
- The content of this volume has been harmonized with further VDA methods, namely Automotive SPICE® and maturity level assurance for new parts (VDA MLA)
- Requirements with regard to purchasing activities were added to P3 and P4
- Specification of the auditor qualification
- Notes on conducting remote audits were added
- Chapter 4 (“Audit process”) was deleted, as its contents are included in ISO 19011
- Chapter 8 (“Process audit services”) was deleted from VDA Volume 6.3
- Chapter 10 (“Best practice/lessons learned”) was deleted
- The evaluation of transport and parts handling (EU7) was omitted
- In some cases, questions with special significance (*-questions) were redefined
- Some of the questions regarding the potential analysis were reallocated
- A comprehensive online glossary for all VDA volumes was established
- Editorial revision

What has remained the same?
- The classification system (A, B, C) for the overall assessment
- The structure of the questionnaire
- The evaluation model for the individual questions (10-8-6-4-0)
- The applicability of process elements P2–P7 according to Figure 2-1
- The Turtle Model
- Previous downgrading rules

During the revision, the distinction between process and system audits was once again explicitly taken into account. The current IATF requirements have been observed.
For products with integrated (embedded) software, the interface between hardware and software has been strengthened. However, for a detailed evaluation of the software development, the Automotive SPICE® method should be used.
Due to the changes that have been made, the results of audits conducted according to the present volume are not directly comparable to the results of audits carried out in accordance with the previous edition from 2016.

Doporučujeme:




Cookies Cookies

Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů.