Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.
Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Corrugated High Density Polyethylene and Polypropylene Pipelines
Přeložit název
NORMA vydána dne 1.12.2021
Označení normy: ASTM F2487-21
Datum vydání normy: 1.12.2021
Kód zboží: NS-1049285
Počet stran: 3
Přibližná hmotnost: 9 g (0.02 liber)
Země: Americká technická norma
Kategorie: Technické normy ASTM
Keywords:
corrugated HDPE pipe, exfiltration, infiltration, leakage testing,, ICS Number Code 23.040.20 (Plastic pipes)
Significance and Use | ||||||||||||||||||||
5.1?This is not a routine test. The values recorded are applicable only to the pipe being tested and at the time of testing. |
||||||||||||||||||||
1. Scope | ||||||||||||||||||||
1.1?This practice covers procedures for testing installed non-perforated, gasketed corrugated high-density polyethylene (HDPE) and corrugated polypropylene (PP) pipelines using either water infiltration or exfiltration acceptance limits to demonstrate the integrity via the level of leakage of the installed materials, construction procedures and installation qualityvia the level of leakage. Pipe to be tested under this practice shall include corrugated HDPE and PP drainage pipe meeting the requirements of Specifications F2306/F2306M, F2763, F2764/F2764M, F2881/F2881M and F2947/F2947M. Note 1:?The performance criteria specified in this standard
may be used for other plastic pipe products. The engineer, however,
must assess if the testing procedures are adequate for the
particular material and installation being considered.
Note 2:?The user of this practice is advised that test
criteria presented in this practice are similar to those in general
use. Pipe, 600 mm (24 in.) diameter or larger, may be accepted by
visual inspection when testing for infiltration.
1.2?This test method shall be performed on lines after all connections and service laterals have been plugged and braced adequately to withstand the test pressures. The time between completion of the backfill operations and testing shall be specified by the approving authority. 1.3?UnitsThe values stated in SI units are to be regarded as standard. The values given in parentheses after SI units are provided for information only and are not considered standard. 1.4?This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.5?This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee. |
||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||
|
Poslední aktualizace: 22.12.2024 (Počet položek: 2 217 000)
© Copyright 2024 NORMSERVIS s.r.o.