Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.
Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)
Přeložit název
NORMA vydána dne 15.11.2022
Označení normy: ASTM F1743-22
Poznámka: NEPLATNÁ
Datum vydání normy: 15.11.2022
Kód zboží: NS-1096743
Počet stran: 8
Přibližná hmotnost: 24 g (0.05 liber)
Země: Americká technická norma
Kategorie: Technické normy ASTM
Keywords:
cured-in-place pipe, installation—underground, plastic pipe—thermoset, rehabilitation, thermosetting resin pipe ,, ICS Number Code 23.040.20 (Plastic pipes)
Significance and Use | ||||||||||||||||||||||||||||||
4.1?This practice is for use by designers and specifiers, regulatory agencies, owners, and inspection organizations who are involved in the rehabilitation of conduits through the use of a resin-impregnated fabric tube pulled-in-place through an existing conduit and secondarily inflated through the inversion of a calibration hose. Modifications may be required for specific job conditions. |
||||||||||||||||||||||||||||||
1. Scope | ||||||||||||||||||||||||||||||
1.1?This practice describes the procedures for the reconstruction of pipelines and conduits (2 in. to 96 in. (5 cm to 244 cm) diameter) by the pulled-in-place installation of a resin-impregnated, flexible fabric tube into an existing conduit and secondarily inflated through the inversion of a calibration hose by the use of a hydrostatic head or air pressure (see Fig. 1). The resin is cured by circulating hot water, by the introduction of controlled steam into the tube, or by photoinitiated reaction. When cured, the finished cured-in-place pipe will be continuous and tight fitting. This reconstruction process may be used in a variety of gravity and pressure applications such as sanitary sewers, storm sewers, process piping, electrical conduits, and ventilation systems. FIG. 1 Cured-in-Place Pipe Installation Methods 1.2?The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. Note 1:?There are no ISO standards covering the primary
subject matter of this practice.
1.3?This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. 1.4?This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee. |
||||||||||||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||||||||||||
|
Chcete pravidelně odebírat informace o nově vycházejících normách z celého světa a to zcela zdarma?
Přihlašte se k odběru. Vše je velice jednoduché a absolutně ZDARMA.
Na výběr máte vydavatele z celého světa.
Poslední aktualizace: 23.12.2024 (Počet položek: 2 217 157)
© Copyright 2024 NORMSERVIS s.r.o.