Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.
Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project
Automaticky přeložený název:
Standardní Practice for Performing a reporting analýze nákladů a při návrhu fáze projektu
NORMA vydána dne 1.4.2012
Označení normy: ASTM E1804-12
Poznámka: NEPLATNÁ
Datum vydání normy: 1.4.2012
Kód zboží: NS-43111
Počet stran: 4
Přibližná hmotnost: 12 g (0.03 liber)
Země: Americká technická norma
Kategorie: Technické normy ASTM
Organizace podniků a management obecně
Stavební průmysl obecně
Keywords:
analysis, cost, design, estimating, Building design and construction, Building economics, Cost analysis (of building constructions), ICS Number Code 03.100.01 (Company organization and management in general), 91.010.01 (Construction industry in general)
Significance and Use | ||||||||||
This practice increases the level of communication, provides an organized approach to cost control during the design of a project, and also provides a means of identifying extraordinary cost items and changes in assumptions between estimates. The users of this practice include owners, developers, contractors, cost professionals, estimators, architects, engineers, specification writers, quantity surveyors, and anyone charged with the responsibility of successfully managing the design of a building and its related site work within a specified project budget. Use this reporting format during the following: Contracting for design cost analysis services, Comparing the current design costs to a previous estimate, and Responding to each design phase. This practice provides a tool for analyzing design options and examining strategies to maintain the project budget. |
||||||||||
1. Scope | ||||||||||
1.1 This practice covers an arranged method for providing cost analysis during the design phase of a building project. 1.2 The use of this practice increases the level of communication between the design professional, owner, and the cost professional providing the cost consulting services. 1.3 The practice establishes a structured method to support design decisions. 1.4 The practice provides design and cost professionals with a framework for historically tabulating information to be used on relevant future projects. |
||||||||||
2. Referenced Documents | ||||||||||
|
Historická
1.8.2009
Historická
1.1.2013
Historická
1.3.2011
Historická
1.3.2011
Historická
1.7.2011
Historická
1.2.2008
Chcete mít jistotu o platnosti užívaných předpisů?
Nabízíme Vám řešení, abyste mohli používat stále platné (aktuální) legislativní předpisy.
Chcete vědět více informací? Podívejte se na tuto stránku.
Poslední aktualizace: 30.04.2024 (Počet položek: 2 896 468)
© Copyright 2024 NORMSERVIS s.r.o.