Potřebujeme váš souhlas k využití jednotlivých dat, aby se vám mimo jiné mohly ukazovat informace týkající se vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.
Standard Practice for Assessment of Attaining Clean Up Level for Site Closure
Automaticky přeložený název:
Standardní praxe pro posuzování dosažení Clean Up Level pro Site Closure
NORMA vydána dne 1.2.2006
Označení normy: ASTM D6597-00(2006)
Poznámka: NEPLATNÁ
Datum vydání normy: 1.2.2006
Kód zboží: NS-35805
Počet stran: 4
Přibližná hmotnost: 12 g (0.03 liber)
Země: Americká technická norma
Kategorie: Technické normy ASTM
Keywords:
clean, closure, decontaminate, impoundment, site, soils, tank, waste, ICS Number Code 13.030.40 (Installations and equipment for waste disposal and treatment)
| Significance and Use | ||||||||||||||||||||||||||||||||||||||||
|
This practice contains a mechanism to determine that the hazardous constituents have been remediated to an acceptable level. This practice assists both the regulator and the owner/operator in establishing cost-effective steps and procedures necessary to determine if the site has achieved its objective for site closure. This practice can be applied to hazardous and nonhazardous spills or leaks, surface impoundments, waste piles, buildings, and tanks. The general nature of this practice allows its use in a large variety of situations. |
||||||||||||||||||||||||||||||||||||||||
| 1. Scope | ||||||||||||||||||||||||||||||||||||||||
|
1.1 This practice covers the steps necessary to determine if a site is ready for closure with emphasis on general sampling techniques and how to determine if the agreed upon level of remediation has been achieved. 1.2 A minimum of statistical procedures is used in this practice. 1.3 The standard practice does not address radioactive waste sites nor does it cover every situation that can occur in the field. It does cover the following general sampling techniques: soil sampling, swipe sampling of buildings and equipment, surface impoundments, waste piles, and layered tanks. It does not cover drum sampling, general water sampling and monitoring wells and their construction. 1.4 This standard does not purport to address all safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices to determine the applicability of regulatory limitations prior to use. |
||||||||||||||||||||||||||||||||||||||||
| 2. Referenced Documents | ||||||||||||||||||||||||||||||||||||||||
|
Chcete mít jistotu o platnosti užívaných předpisů?
Nabízíme Vám řešení, abyste mohli používat stále platné (aktuální) legislativní předpisy.
Chcete vědět více informací? Podívejte se na tuto stránku.
Poslední aktualizace: 02.08.2026 (Počet položek: 2 290 553)
© Copyright 2026 NORMSERVIS s.r.o.