NORMSERVIS s.r.o.

IEEE P1829

IEEE Approved Draft Guide for Conducting Corona Tests on Hardware Assemblies for Overhead Transmission Lines and Substations

NORMA vydána dne 2.2.2026

Anglicky -
Zabezpečené PDF - okamžité stažení (1307.10 CZK)

The information about the standard:

Designation standards: IEEE P1829
Publication date standards: 2.2.2026
Approximate weight : 300 g (0.66 lbs)
Country: International technical standard
Kategorie: Technické normy IEEE

Annotation of standard text IEEE P1829 :

Revision Standard - Active - Draft.
This guide establishes uniform procedures for the testing of transmission line and station bus hardware assemblies in high voltage (>100 kV) laboratories. Two tests are described. The first one is a corona performance test. The second is a radio interference voltage (RIV) test. The first test uses visible techniques to determine the onset of positive corona. The second test is a measurement of the RIV voltage according to ANSI C63.2 or CISPR 16-1-1 and CISPR 18-2. This guide does not address the permissible radio interference (RI) limits or specified corona extinction voltages. They are set either by regulation or by agreement between the end user and hardware manufacturer.

ISBN: 979-8-8557-2554-4, 979-8-8557-2554-4
Number of Pages: 32
Product Code: STDUD28202, STDAPE28202
Keywords: corona, RIV, tests, hardware assemblies, IEEE 1829(TM), visible, positive corona
Category: Power Transmission and Distribution
Draft Number: P1829/D2, Aug 2025 - UNAPPROVED DRAFT, P1829/D2, Aug 2025 - APPROVED DRAFT