Communication networks and systems for power utility automation - Part 4: System and project management
NORMA vydána dne 11.4.2011
Označení normy: IEC 61850-4-ed.2.0
Datum vydání normy: 11.4.2011
Počet stran: 74
Přibližná hmotnost: 222 g (0.49 liber)
Země: Mezinárodní technická norma
Kategorie: Technické normy IEC
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid. La CEI 61850-4:2011 sapplique a des projets associes aux procedes proches des systemes dautomatisation des compagnies delectricite (UAS), par exemple les systemes dautomatisation de poste (SAS). Elle definit la gestion du systeme et la gestion de projet pour les systemes UAS avec communication entre des dispositifs electroniques intelligents (IED) dans le poste ou le site ainsi que les exigences concernant les systemes associes. La presente seconde edition constitue une revision technique avec des details plus proches des autres parties de la serie de Normes CEI 61850. Le domaine dapplication porte non seulement sur les systemes dautomatisation de poste, mais aussi sur tous les systemes dautomatisation pour les compagnies delectricite. This publication is of core relevance for Smart Grid.